Coming Soon – Version 2.11.0

There are quite a few new features arriving with version 2.11.0. here is a summary, but if you download this PDF document you will see a full description of the new features under the first topic, “What’s New in Version 2.11.0”. The new Commissioning...

Order Merging

It is quite common for several orders or requisitions to be raised for a single supplier in a given period. Often, before the orders are sent to the supplier they are combined into a single order. This can reduce postage & packaging charges and also makes orders...

Job Checklists

Job checklists have been added to version 2.10.0, which should go into beta release this week. The sample below shows the checklist for a Philips MRX defibrillator. (NOTE: this sample is given to illustrate how checklists work. Please don’t use the values shown...

Recording Engineer’s Experience

If you can remember the old SEMS system (long gone, but not yet forgotten), then you might recall that it provided a way of recording an engineer’s experience on a model-by-model basis. You could create coded levels of experience, such as...

Device Commissioning Requests

While many e-Quip installations allow engineers to commission new devices, for some creating new inventory records is a supervisor-level task. A new screen, Device Commissioning Request, has been added to support this. Essentially the purpose of this screen is to...

e-Quip for the Pocket PC

Starting with version 2.8.0, which will be released within the next couple of weeks, e-Quip will include a Pocket PC interface. This will run on any PDA running Windows Mobile 6 or 6.5 Classic. You might ask why we chose this particular device. We had taken the...